Newfield Peninsula Malaysia Inc.

Attention: open in a new window. PrintE-mail



Client: NEWFIELD PENINSULA MALAYSIA INC.

Country: Malaysia

Project Description:

Provision of Transportation and Offshore Installation of  East Belumut-A and Chermingat Jacket, Topside and Pipeline  Project

  • BEL-A Jacket Dual Lifting by HD 60 and HD2500
  • CHR-A Jacket Side Lifting by HD 60
  • 10” with 4.5” piggy back Pipeline Transportation and Installation
  • 10” with 4.5” Piggy back Spool Tie-In

Completion Date: December 2007

Engineering:

Completed line pipe transportation studies, Heavy Lifting

Analysis (Single and Dual Lifting) and riser installation analysis

 

 

 
JoomlaWatch 1.2.12 - Joomla Monitor and Live Stats by Matej Koval

49.4%Malaysia Malaysia
13.6%Israel Israel
6.7%Australia Australia
5.5%United States United States
4.8%Brazil Brazil
2.9%Singapore Singapore
2.3%India India
1.8%Italy Italy
1.1%United Kingdom United Kingdom
1%Republic Of Korea Republic Of Korea

Today: 4
Yesterday: 7
This Week: 42
Last Week: 61
This Month: 184
Last Month: 342
Total: 892